Heilongjiang Hengtai Stone Resources Development Co., Ltd. slope monitoring system construction project inquiry procurement announcement

Bidding dynamics

Information classification

Heilongjiang Hengtai Stone Resources Development Co., Ltd. slope monitoring system construction project inquiry procurement announcement

【十大澳门网站赌博】

Heilongjiang Hengtai Stone Resources Development Co., Ltd. slope monitoring system construction project inquiry procurement announcement

【十大澳门网站赌博】

详情

1.Terms of purchase

The project of slope monitoring system construction project of Heilongjiang Hengtai Stone Resources Development Co., LTD. (hereinafter referred to as the "Project") is procured by Heilongjiang Hengtai Stone Resources Development Co., LTD., and the procurement project funds come from the enterprise。We are now conducting a comparative purchase for this project。

2.Project overview and procurement scope

2.1 Project name: Slope monitoring system construction project of Hengtai Stone Resources Development Co., LTD

2.2 Project Overview:

The project is located at about 7 south west of Xiaoling Town.At 0km, the quarry mine is open pit mining. The scope of this purchase is construction, including surface deformation monitoring equipment and ancillary facilities, online monitoring system installation and commissioning and networking。

2.3 Service Content:

2.3.1. Complete the construction of the surface deformation monitoring part of the slope monitoring system, and carry out networking work. See technical parameters for details。

2.3.2 Ancillary equipment and services: power supply system, lightning protection system, backup power supply, online monitoring system software, installation and commissioning services。

Purchase list

序号

Project name

数量

单位

Unit price (Yuan)

Total price (Yuan)

1

Radar main engine

(including system software)

1

1200000

1200000

2

Radar mounting bracket

1

5000

5000

3

Electric heating in the radar room

1

2000

2000

4

Radar room monitoring

1

3000

3000

5

Uninterruptible ups power supply

1

10000

10000

6

Slope monitoring system construction scheme, acceptance report

1

40000

40000

7

System installation and debugging

1

90000

90000

合计

1350000

Note: The above items include all spare parts prices required for the completion of the project, and the winning bidder cannot charge fees separately。

Technical parameter

序号

参数

Technical requirement

备注

1

Operating frequency band

K

 

2

Detection range

The maximum detection distance is not less than 5500 meters;(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

3

Azimuthal covering

Single maximum scanning azimuth coverage Angle is not less than 360°;(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

4

Deformation data update rate

The maximum deformation data update rate is not less than 1 time/minute (180° scene azimuth Angle, including deformation data processing time);(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

5

Deformation sensitivity

Deformation measurement accuracy is better than ±0.1mm (at all azimuths, 1km, RMS)

 

6

Range resolution

Not greater than 0.1 m (at all azimuths); (The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

7

Scanning speed

0.5 to 16 minutes/week

 

8

Pitch coverage Angle

The maximum pitch coverage Angle range is not less than 45°;(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

9

Host power consumption

Total power consumption of radar equipment ≤40W (including radar host, scanning turntable, signal data processing equipment (can output deformation data));(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

10

Class of protection

Shell protection grade: not less than IP66;(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

11

Operating temperature

Operating temperature range: -40℃~+55℃ normal operation temperature;(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

12

Atmospheric drift calibration

With atmospheric drift calibration function。The deformation drift after calibration is better than ±1 mm;(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

13

Data output interface

Wired /WiFi /4G mobile network;

 

14

Data acquisition and processing

The radar adopts the integrated design of data acquisition and deformation data processing and calculation (no additional workstation is required, the radar can directly calculate and output the processed deformation data in real time).

The radar supports the measurement of the initial orientation of the radar and uploads the orientation data to the computer software.Support the positioning of the radar position and upload the positioning data to the computer software;

 

15

User interaction

The host has a running status display, which can display real-time radar operating status, real-time voltage and current, real-time temperature of the internal processor, real-time temperature of the motor and other status information;

 

16

Rotation speed configuration

With the function of radar rotation speed configuration, different rotation speeds can be configured according to the actual scenario, and the total rotation time of a scanning week can be set to 0.5 minutes to 30 minutes;

 

17

重量

Total radar weight ≤25 kg;(The test qualification should be reflected in the test report issued by the third-party testing institution with CNAS or CMA certification)

 

18

Uninterruptible UPS power supply

1, rated capacity 2kVA/1600W

2, voltage range 115-300VAC

3. Frequency 40-70Hz

4, power factor 0.98

5. Bypass voltage 80VAC×(1±5%) ~ 285VAC×(1±5%) Default 180VAC×(1±5%) ~ 264VAC×(1±5%

6, the national standard GB 7260.1-2008

 

19

Data processing software

1. The software adopts B/S architecture, supports two modes of remote cloud platform deployment or onsite PC deployment, and supports all Chinese display interface。(Screenshot of the software interface is provided)

2, can automatically generate monitoring reports, support unattended。

3. The system should have the functions of multi-project management, coordinate parameter setting, measuring point management, monitoring type combination management, layout management, comprehensive monitoring analysis, two-dimensional code pass, data management, manual monitoring, alarm management, report management, inspection management, mobile monitoring and inspection。(Screenshot of the software interface is provided)

4, support in the video playback interface image stream and other monitoring types of data fusion, video playback, alarm screenshot, hard disk recorder access and other functions。(Screenshot of the software interface is provided)

5, the radar display module can achieve a single 360° imaging display, according to the monitoring needs, can arbitrarily mark the monitoring point/area within the effective monitoring range of the radar;It can display 1/2/6/12/24/48 hours and historical deformation field information, including cumulative shape variable, deformation rate, deformation acceleration, etc。

6. The radar display module supports the function of uploading the echo intensity image to the server according to the set extraction ratio to control the transmission flow。

7, can set a four-level warning threshold, and achieve SMS/audible and visual alarm, early warning can describe the alarm cause, disposal method, comprehensive research results and upload on-site investigation photos through manual disposal function。(Screenshot of the software interface is provided)

8, support the deformation curve of the monitoring point/area to save;It can save deformation data, complex scattering graphs, communication logs, system logs, etc.Supports automatic cyclic storage when the remaining disk space reaches the lower limit;It has the function of display and query of complex scattergraph and deformation graph data, including query of historical monitoring results。

9. The radar display module can realize deformation field imaging and realize integrated 3D display with imported 3D topographic map registration;The 3D coordinates of any point in the imaging scene can be extracted (in the case of imported 3D terrain), as well as segmented and overall historical deformation information。

10. The system supports DEM data import,2D / 3D switching display,With gray map/topography map switch display function;The deformation curves (shape variable, speed, acceleration) of different monitoring points or regions can be displayed on the same curve;It has the function of fusion display of monitoring point, monitoring area, complex scattering intensity map, deformation data map and 3D topographic map。

11, the above software functions must be implemented under the same software program, the same IP and port。(Screenshot of the software interface is provided)

12, the system includes 3D GIS data release engine function, supporting the image cache file (*.tif), elevation cache file (*.terrain/*tif), vector cache files (*.shp), b3dm 3D model files (*.json), osgb 3D model files (*.xml), obj 3D model file (*.obj), lob 3D model files (*.Data such as json is automatically published as a Web service and can be loaded in the platform。

13, the system should have remote control function, should be able to remotely control the equipment to start working, stop working, shut down and restart。After the restart, the radar has automatic network connection, automatic parameter configuration and automatic deformation monitoring before the restart。

14, the software needs to support lifelong free use, and must be the necessary function and security maintenance updates。

 

 

2.Service period: Within 15 days after signing the contract。

2.5 Bid section division: This purchase is divided into 1 bid section, the maximum inquiry ratio limit price: 1350000.00 RMB。

3.Supplier qualification requirements

3.The supplier shall have the status of an independent legal person of the People's Republic of China, hold the business license of an enterprise legal person issued by the administrative department of industry and commerce, and its business scope shall include the service content of the project and have the ability to adapt to the project in terms of personnel, equipment and funds。

3.2 This procurement does not accept the consortium units to participate in the competition。

3.3 Others: The project evaluation method adopts the comprehensive evaluation method, and the supplier qualification examination adopts the post-qualification examination method。

3.4 Legal persons, other organizations or individuals who have an interest relationship with the purchaser that may affect the impartiality of the procurement shall not participate in the procurement activities。The person in charge of the unit is the same person or different units that have a holding and management relationship, and shall not participate in the procurement activities of this survey at the same time。Otherwise, the relevant response files are invalid。

3.5 On the "Credit China" website (http://www.creditchina.gov.cn) or Credit China (Heilongjiang) website (http://www.hljcredit.gov.cn/), suppliers that are included in the list of persons subject to enforcement for dishonesty shall not participate in the procurement activities of this survey。

3.6. Suppliers are listed in the National Enterprise Credit Information Publicity System (http://www.gsxt.gov.Listed in the list of seriously illegal and dishonest enterprises, shall not participate in this survey procurement activities。

3.In the past three years (from October 1, 2020 to the deadline for submission of response documents), the supplier or its legal representative has a record of criminal bribery (the record of bribery crime is available on the website of China Judgment Documents (http://wenshu).court.gov.cn/) shall be subject to the query results) and shall not participate in the procurement activities of this poll。

4.Acquisition of purchasing documents

4.1 Poll procurement documents are available from 08:00 on December 08, 2023 to 08:00 on December 11, 2023。

4.2 How to obtain procurement documents: already in the"Heilongjiang government and enterprises recruit digital service platform(hereinafter referred to as the "Procurement Service Platform") registered suppliers directly online click "I want to sign up",Complete registration as required,And obtain procurement documents;Unregistered suppliers need to click "Registration and CA Management" on the Procurement Service Platform portal.,After completing registration as required, registration and procurement documents can be obtained;Suppliers can carry out the whole process of electronic recruitment activities only after completing the CA digital certificate。This is the only way to obtain procurement documents. Those who obtain procurement documents through other channels are not eligible to participate in this project.

4.3 CA digital certificate can be handled online or on-site:

Address: 245 Songbei Road, Harbin City (Recruitment Service Center), please refer to the telephone number below the portal website。

4.4 Inquiry purchase document price 500 RMB, non-refundable。

4.5 Documents required for obtaining the purchase document: None。

5.Purchase deposit

5.1. Amount of purchase deposit: No bid deposit is charged for this project。

6.Submission of response documents

6.1 Deadline and opening time for submission of response documents: 09:30 on December 14, 2023。

6.The supplier shall use the bidding document making tool provided by the procurement service platform to prepare the response document, and encrypt and submit it according to the requirements of the procurement document。Before the bidding deadline specified in the procurement documents, the supplier shall log in to the procurement service platform through the Internet using the CA digital certificate, upload the encrypted response file, and save the electronic signature voucher automatically generated by the system after the successful upload. The submission time shall be the electronic signature voucher time。The supplier shall fully consider the unforeseeable factors when uploading the documents. Failure to upload the documents before the bid deadline shall be deemed as overdue delivery and will not be accepted。

7.Response file opening time and location

7.1 Response file opening time: response file submission deadline。

7.2 Response document opening location: log in to the "Procurement Service Platform", enter the "bid opening hall" to select the bid section for sign in, and follow the opening of the purchaser's documents online in real time when the response document is opened。

8.Medium by which announcements are made

The procurement announcement of this project is posted on the Heilongjiang Government and Enterprise recruitment digital service platform (http://zc.hljsjtjt.com/), China Tendering and Bidding Public Service Platform (http://www.cebpubservice.com)。

9.其他

This project adopts the whole process of electronic recruitment through the procurement service platform (http://zc.hljsjtjt.com/) To carry out polling procurement activities, registration and operation and other related content, please refer to the portal help center "Heilongjiang Trading Group electronic recruitment trading platform Supplier Operation Manual", to participate in the process of polling procurement platform problems can call the technical support phone。

10.Contact information

Supervision department: Heilongjiang Trading Materials Resources Development Co., LTD

电    话:0451-53795000

 

Purchaser: Heilongjiang Hengtai Stone Resources Development Co., LTD

Add: Group 4, Nantun Village, Xiaoling Town, Acheng District, Harbin City, Heilongjiang Province

Contact: Mr. CAI

电    话:13091860519

 

Agency: Heilongjiang Huilong Engineering Management Consulting Co., LTD

Address: No.3, 17th Floor, Diwang Building, No.30 Ganshui Road, Xiangfang District, Harbin City

Contact: Ms. Chen

电    话:0451-87623286-8041

 

 

December 07, 2023

Scan the QR code with your phone

Friendly link