【十大澳门网站赌博】This Law is formulated for the purpose of regulating tendering and bidding activities, protecting the interests of the state, the public and the legitimate rights and interests of the parties to tendering and bidding activities, improving economic benefits and ensuring the quality of projects。

Charging standard (refer to Black Price Union [2013] 39)

【十大澳门网站赌博】This Law is formulated for the purpose of regulating tendering and bidding activities, protecting the interests of the state, the public and the legitimate rights and interests of the parties to tendering and bidding activities, improving economic benefits and ensuring the quality of projects。

  • 分类:Knowledge tool
  • 作者:
  • 来源:
  • Release time:2021-07-30 13:42
  • Visits:
详情

Notice on the issuance of "Heilongjiang Province Project Cost Consulting Service Fee Management Measures"

Heilongjiang Provincial Price Supervision Administration

Heilongjiang Provincial Department of Housing and Urban-Rural Development

 

Black valence2013]39号

 

Heilongjiang Provincial Price Supervision Administration Heilongjiang Provincial Department of Housing and Urban-Rural Development

 Notice on issuing the "Heilongjiang Province Project Cost Consulting Service Fee Management Measures"

 

各市(Locality), county (city) Price Bureau, Housing Bureau, Provincial Reclamation area, Forestry Industry Bureau Price Bureau, Housing Bureau, Suifenhe City, Fuyuan County Price Bureau, housing Bureau, all project cost consulting enterprises, relevant units:

In order to standardize the charging behavior of engineering cost consulting service and promote the healthy and orderly development of engineering cost industry, the "Heilongjiang Province Project Cost Consulting Service Charging Management Measures" is issued to you, please follow。

 

 

 

 Heilongjiang Provincial Price Supervision Administration Heilongjiang Provincial Department of Housing and Urban-Rural Development

 28 April 2013

 

Heilongjiang Province project cost consulting service fee management measures

  Article 1 In order to strengthen the management of engineering cost consulting service fees in our province,Standardize the charging behavior of engineering cost consulting services,Safeguard the legitimate rights and interests of the parties concerned,To promote the healthy and orderly development of engineering cost consulting service industry,According to the "Project cost consulting Enterprise Management Measures" (Ministry of Construction Order No. 149), "intermediary service fees Management Measures" (price [1999] No. 2255) and the relevant national and provincial laws and regulations,Formulate these measures。

Article 2  These Measures are applicable to the construction cost consulting Enterprise Qualification Certificate issued by the construction administrative department in accordance with the law and registered in the administrative department of industry and commerce in the administrative area of this province。

Article 3  The project cost consulting service fee refers to the fee charged by the project cost consulting enterprise to provide professional consultation on the determination and control of the construction project cost, issue the project cost outcome document and other business activities。The main business scope of engineering cost consulting services includes: construction project proposal and feasibility study investment estimation, project economic evaluation report preparation and review;Construction project budget preparation and review,And with the design scheme selection, optimization design, quota design and other work for engineering cost analysis and control;Determination of the contract price of the construction project (including the list of quantities of the bidding project and the tender price, the preparation and review of the bid price);Signing and adjusting the contract price (including engineering changes, engineering negotiations and calculation of claim costs) and payment of project funds,Preparation and review of project settlement and completion settlement (settlement);Provide engineering cost information services, etc.;Manage and serve the whole process or several stages of the organization and implementation of construction projects。

Article 4  Project cost consulting service fee belongs to the business service fee, the government guided price management。Project cost consulting enterprises should adhere to the principles of voluntary entrustment, paid service and payment by the client。

Article 5  According to the nature and content of different consulting projects, the project cost consulting service fee shall be calculated by the method of gradation and progression. The fee standard and calculation method are shown in Annex I and Annex II。The above charging standard is the highest charging standard, and the project cost consulting enterprise may determine the specific charging standard through consultation with the entrusting party within the scope of not exceeding the highest charging standard and not exceeding 20% of the floating range according to the specific circumstances of the construction project consulting project。

Article 6  Project cost consulting enterprises should follow the principles of openness, fairness, reasonableness, fair competition and honesty and credit in carrying out project cost consulting activities, and provide cost consulting results documents in strict accordance with business rules。

Article 7  The project cost consulting service enterprise shall sign a consulting service contract with the entrusting party according to law, specifying the service content, performance period, fee standard and fee amount。The entrusting party shall, in accordance with the consulting contract, provide the project cost consulting enterprise with the necessary working conditions and materials for carrying out the consulting business in a timely manner;The consulting service enterprise shall, in accordance with the contract, complete the consulting service on time and provide the consulting results with good quality and quantity。

Article VIII  If the project cost consulting business occurs outside the place where the consulting enterprise is registered, the travel expenses are not included in the consulting service fee standard。Reasonable travel expenses related to the entrusted business shall be paid by the principal separately upon mutual agreement between the two parties。

The ninth article  In the completion settlement review, the basic charge and benefit charge of the reduced amount shall be borne by the client, and the benefit charge of the increased amount shall be paid by the beneficiary or may be paid by the principal on behalf of the beneficiary。

Article ten  Project cost consulting service enterprises to collect service fees from the client, shall issue legal bills to the client。If a legal instrument cannot be provided, the trustor may refuse to pay。

Article 11  Project cost consulting service enterprises should strictly implement the relevant provisions of clearly marking the price, publicize the charging items, charging standards, service content, charging methods and "12358" price reporting telephone in the prominent position of the business site and payment site, and accept the supervision of all sectors of society。

Article 12  The competent price department and the competent construction administrative department shall be responsible for the supervision and administration of the fees for consulting services of project cost。For violations of these measures and relevant laws and regulations, the price department and the construction administrative department shall be punished in accordance with the relevant provisions of the Price Law, the Provisions on Administrative Penalties for Price Violations and the Management Measures for Project Cost Consulting Enterprises。

Article 13  These measures shall be interpreted by Heilongjiang Provincial Price Supervision Administration and Heilongjiang Provincial Department of Housing and Urban-Rural Development。

Article 14  These measures shall be implemented from June 1, 2013 to May 31, 2014, and the "Notice of Heilongjiang Provincial Price Bureau and Construction Committee on the release of Construction project cost consultation Fee Standards" (Black Price joint character [1999] 54) shall be repealed at the same time。

 附件: 1.Heilongjiang Province project cost consulting service fee standard table

 2.Heilongjiang Province project cost consulting service fee standard calculation method

附件1

Heilongjiang Province project cost consulting service fee standard table

 

 

序号

Charge item

Charge base

Graded progressive standard rate (‰)

Job content

≤500    万元

500-1000 含1000

万元

1000-3000 contains 30 million yuan

3000-5000 includes 50 million yuan

50 million to 100 million yuan  including 100 million yuan

100 million to 500 million  including 500 million

>5亿元

1

A investment decision stage

Compilation and review of investment estimates

Total investment

0.5

0.5

0.4

0.3

0.3

0.2

0.1

According to the construction plan drawn up by the feasibility study, prepare or review the investment estimate, and issue the investment estimate or feasibility economic evaluation report。

2

B Design phase

Quota pricing

Design estimate preparation

Engineering cost

1.2

1.2

1.1

1.0

1.0

1.0

0.9

According to the feasibility study report, design engineering quantity and other relevant information provided by the client。According to the budget estimates or quotas involved in the project, the valuation is carried out, and the cost outcome documents issued include the project budget estimates and consulting reports。

3

Design estimate review

Engineering cost

1.3

1.3

1.2

1.1

1.1

1.1

1.0

According to the feasibility study report provided by the commissioning party, the design engineering quantity, the budget estimate submitted for examination and other relevant information, according to the budget estimate index or quota involved in the project, the valuation audit is carried out, and the cost outcome document issued includes the project budget statement and consulting report。

4

C bid  bid  stage  section  (to  stage )

Quota pricing

Construction drawing budget, bidding control price, bidding bottom price, bidding quotation preparation

Basic charge

Engineering cost

4.1

3.9

3.5

3.4

3.3

3.2

3.1

Calculate engineering quantity, material and equipment inquiry, apply quota, cost calculation, etc., according to construction drawings and relevant specifications for pricing, if necessary, on-site survey, issue construction drawing budget, bidding control price, bidding bottom price and consulting report and other cost outcome documents。

5

Construction drawing budget, bidding control price, bidding bottom price, bidding quotation review

Basic charge

Submit project cost for approval

4.2

4.0

3.6

3.5

3.4

3.3

3.2

According to the construction drawings and relevant specifications, the engineering quantity calculation, material and equipment inquiry, application quota, cost calculation, valuation method, valuation process, etc. are reviewed and rechecked. If necessary, the site investigation can be conducted。Issue construction drawing budget, bidding control price, bidding bottom price, project audit report and other relevant cost outcome documents after audit。

Benefit charge

The amount of deduction and the amount of increase

30

6

C bid  bid  stage  section  (to  stage )

  alone 

Construction drawing budget, bidding control price, bidding bottom price, bidding quotation preparation

Basic charge

Engineering cost

5.3

5.1

4.6

4.4

4.3

4.2

4.0

According to the construction drawings and other relevant materials provided by the client,According to relevant specifications,Calculate the quantity of work, set of corresponding list number, material and equipment inquiry, calculate the comprehensive unit price and total price, calculate fees and taxes, etc,If necessary, on-site investigation may be conducted,Issue the corresponding construction drawing budget, bidding control price, bidding bottom price and consulting report and other corresponding cost outcome documents according to the pricing format of the bill of quantities。

7

Construction drawing budget, bidding control price, bidding bottom price, bidding quotation review

Basic charge

Submit project cost for approval

5.4

5.2

4.7

4.5

4.4

4.3

4.1

According to the construction drawing budget provided by the client(or bidding control price, bid price, bid price) construction drawings and other relevant materials,According to the bill of quantities valuation specifications and other relevant basis of valuation,Review the calculation of engineering quantity, set of corresponding list number, material and equipment inquiry, calculation of comprehensive unit price and total price, calculation of fees and fees and taxes,If necessary, on-site investigation may be conducted,Issue construction drawing budget according to bill of quantities valuation format (or bidding control price,, Tender price) and audit report and other corresponding cost outcome documents。

Benefit charge

The amount of deduction and the amount of increase

30

8

D Construction stages

The whole process of construction cost control

Primary charge

Engineering cost

10.0

9.0

8.0

6.5

5.0

4.0

Payment of project advance payment: check the advance payment according to the construction contract and progress;Project measurement payment: review the monthly report of completed workload submitted by the construction unit, and provide the monthly payment proposal;Engineering change: Assist the client to review the costs incurred due to design change, on-site visa, etc.Engineering claims: when engineering claims are made by both contracting parties,Provide advice to the client;Deviation adjustment: Make investment deviation analysis and investment plan adjustment proposal according to construction progress plan and actual situation;And issue the corresponding cost result document according to the progress。

9

E completion and final accounting stage

Compilation of completion settlement

Primary charge

Engineering cost

4.3

4.0

3.8

3.5

3.4

3.3

3.2

Calculate the quantity of works and adjust the price according to the construction contract, completed drawings and completed materials;A construction project consists of multiple individual projects or unit projects,The completion settlement of each individual project or unit project shall be summarized,Prepare the corresponding project settlement statement,And write preparation instructions;Implement a phased settlement project,The settlement of each stage of the project shall be summarized,Prepare project settlement statement,And write preparation instructions;The implementation of professional subcontracting settlement projects,The settlement of each professional subcontract project shall be summarized in the corresponding individual project or unit project settlement,And write preparation instructions;The preparation of project settlement shall be in written form and the electronic document format approved by the auditing unit to ensure the integrity of settlement data。Issue the corresponding cost result document。

10

E completion settlement and final accounts section

Completion settlement audit

Basic charge

Submit project cost for approval

4.5

4.2

4.0

3.7

3.6

3.5

3.4

According to the relevant materials provided by the entruster, such as the construction contract, completed drawings, completed materials, bidding documents, bidding documents and completion settlement statement, the evaluation shall be conducted according to the pricing standard or pricing method agreed in the construction contract: the over-counted and re-listed items in the project settlement shall be deducted, and the under-counted and omitted items shall be increased;Any discrepancy between the project settlement and the completed drawings or the facts shall be adjusted according to the actual situation。During the audit, it is found that the project settlement is inconsistent with the completed drawings or the facts,The parties shall be invited to perform confirmation procedures;Settlement of works subcontracted by the general contractor,Its content is inconsistent with the main terms of the general contract,The audit shall be carried out in accordance with the principles stipulated in the general contract;Project settlement audit documents shall be in written form and electronic documents;Issue the corresponding cost result document。

Benefit charge

The amount of deduction and the amount of increase

80

11

Calculation of rebar and embedded parts

Calculated tonnage

12元/吨

钢筋Calculation and review of the amount of (iron parts) : calculate or review the weight of various specifications of steel bars (iron parts) according to the construction drawings and relevant standards, and issue the corresponding cost result documents。

12

Hour charge (Yuan/ Person/hour)

Registered cost Engineer:350 Senior title cost staff: 260 Intermediate (junior) title cost staff: 150

以上"Charging Items" does not include some charging items based on working hours。If necessary, produce the corresponding cost result document。

 

附件2

Heilongjiang Province project cost consulting service fee standard calculation method

1.The basic charge shall be based on the cost of a single project。  

2.The main materials of the project shall be included in the charging base;If the equipment cost is included in the project cost, it shall be incorporated into the charging base。

3.When it is necessary to calculate the amount of work, the consulting fee shall be calculated according to the corresponding standard of the construction drawing budget。

4.The whole process of cost control in the construction stage, whether using quota pricing or list pricing, shall be implemented according to the corresponding standards。If the amount of increase or decrease due to design changes, on-site visa, claims, etc., the benefit fee shall be 8% of the amount of increase or decrease。

5.The rates set out in Annex I are calculated on a graded scale。If the amount charged according to this standard is less than 2,000 yuan, it shall be charged at 2,000 yuan。

6.Consulting fee calculation formula: consulting fee =∑ basic fee × adjustment coefficient + decoration project increase fee + benefit fee + steel bar calculation fee

7.Adjustment coefficient: ① Maintenance, reconstruction, expansion, technical transformation and other projects according to the corresponding fee standard multiplied by 1.2 coefficient。② Prepare a separate list, a separate audit list, multiplied by 0 according to the corresponding standard.7系数。③ Only the part of the project other than the bid price is reviewed, the basic fee is based on the project price other than the bid price as the billing base, and the rate is multiplied by 2 according to the corresponding standard.8 coefficient;④ When consulting the material fee, you can refer to the settlement cost standard calculation method, where the basic fee is multiplied by 1.6系数。

8.For budget, settlement preparation or audit consultation, decoration project increase fee = decoration project cost ×1.2‰

9.The consulting fee for steel bars and embedded iron parts shall be charged separately according to the standard of Annex I。

10.Cost consulting service fee example: a new single project, commissioned a cost consulting company to complete the settlement audit, the project submitted for approval of the project cost of 56 million yuan (including senior decoration project 7 million yuan), 400 tons of steel, nuclear increase of 50,000 yuan, approved by 3 million yuan。The cost consulting fee is calculated as follows:

A) Basic Fee (segmented charge) :

500万元×4.5‰=22500元

(1000-500)万元×4.2‰=21000元

(3000-1000)万元×4.0‰=80000元

(5000-3000)万元×3.7‰=74000元

(5600-5000)万元×3.6‰=21600元

B) Additional charge for decoration works: 700×1.2‰=8400元

C) Benefit charge: RMB 3 million × 8% + RMB 50,000 × 8% = RMB 244,000

D) Steel bar calculation: 400 tons ×12 yuan/ton =4800 yuan

E) Consultation fee =∑ basic fee × adjustment factor + decoration project increase fee + benefit fee + steel bar calculation fee = (22500+21000+ 80,000 +74000+21600) +8400+244000+4800= 476,300 yuan